The project is located near. Sukhindol, Veliko Tarnovo region, Bulgaria
Covers approximately 900 hectares of land
The land is rocky with low category and is uncultivable, being rented with a long-term lease.
It is located between the Mizian Platform and the Pre-Balkan – the terrain is low hilly, with a limestone base
Capacity and technology:
Maximum capacity: 620 MWp DC / 500 MW AC
Integrated energy storage system: up to 250 MW / 1 000 MWh BESS
Technical infrastructure:
One boosting station
2 transformers 375MW each (110kV/400kV)
Overhead line 3×2 (110kV)
Development:
The project is part of Green Source’s broader portfolio, including 30 projects with a total investment volume of more than EUR 820 million in Central and Eastern Europe.
Several hundred jobs will be created during construction, and more than 50 new jobs will be created once it is operational – both directly and through local suppliers and partners.